Durham East - Acoustic Enclosure

Hobson Smith

Durham east

Brief 

There was a loud transformer situated extremely near to a large group of residential units including a hotel. Complaints had been made and dBA were called in to assist.

Assessment

Upon inspection it was confirmed that a full enclosure would be required. dBA installed this fast and efficiently due to very tight outage. Full dBA site staff attendance was required to get this project completed within the ten-day timeframe offered.

Solution

dBA worked closely with the client to ensure that the works were carried out on schedule, and the conclusion was extremely positive. Leaving our client and those within the immediate area extremely pleased with the noise reducing result.