
Brief
There was a loud transformer situated extremely near to a large group of residential units including a hotel. Complaints had been made and dBA were called in to assist.
Assessment
Upon inspection it was confirmed that a full enclosure would be required. dBA installed this fast and efficiently due to very tight outage. Full dBA site staff attendance was required to get this project completed within the ten-day timeframe offered.
